BigD
  • Home
  • About
  • Safety
    • Safety Training
    • Credentials and Certifications
    • Job Safety Analysis
    • Safety Compliance Memberships
  • Services
    • Turnkey Frac Services
    • Turnkey Drill Site
    • Construction Company
      • Construction Overview
      • 3D GPS Precision
      • In-House Design
      • Drilling Locations, Pad Sites & Lease Roads
      • Frac Pit Construction
      • Tank Battery Facility Pads
      • Pit & Location Remediations
      • Environmental Cleanup
      • Deep Bury / Pit Closures
      • Drone Services
    • Equipment Company
      • Pit Lining
        • Liner Systems
        • Extrusion Welded Boots
        • Geotextile
        • Erosion Control
        • Liner Removal and Disposal
        • Load Lines
        • Aeration Systems
        • Bird Netting and Deterrent Systems
        • Floating Frac Pit Covers
      • Poly Pipe
        • Poly Pipe Rental & Sales
        • Load Lines
        • Custom Poly Pipe Fabrication
        • Pipeline Install and Trenching
        • Rig Move & Drill Site Installations
        • Poly Pipe Banding & Transportation
      • Water Transfer
        • Frac Site & Pit to Pit Services
        • Automated Blending Manifolds
        • Flowback Transfer Services
        • Lay Flat Hose
        • Diesel Transfer Pumps
      • Water Treatment
        • Process Description
        • Custom Filters
        • Automation & Monitoring
      • Generators & Light Towers
      • Fencing - Temporary and Permanent
      • Water Wells
        • Water Well Pump Rental & Sales
        • Submersible Pit Pumps
        • Electrical Centrifugal Booster Pumps
        • Diesel Transfer Pumps
      • Automation
        • SCADA
        • NEW Mobile Gas Monitoring System
        • Camera Systems
        • Production Automation
        • Water Automation
        • Rentals
      • Drone Services
      • Trash Trailers
  • Gallery
  • Contact
  • Careers
  • News
  • Web Portal
  • Turnkey Frac Services
  • Turnkey Drill Site
  • Construction Company
    • Construction Overview
    • 3D GPS Precision
    • In-House Design
    • Drilling Locations, Pad Sites & Lease Roads
    • Frac Pit Construction
    • Tank Battery Facility Pads
    • Pit & Location Remediations
    • Environmental Cleanup
    • Deep Bury / Pit Closures
    • Drone Services
  • Equipment Company
    • Pit Lining
    • Poly Pipe
    • Water Transfer
    • Water Treatment
    • Generators & Light Towers
    • Fencing - Temporary and Permanent
    • Water Wells
    • Automation
    • Drone Services
    • Trash Trailers
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide

Flexibility

Big D’s Mobile System is Flexible

  • Can handle various fluctuations of water, ranging in high oil to high H2S / Sulfur content.
  • Can adapt based on the customer’s site, and their ability to pull off AST tanks, pipeline, or SWD facility

High Oil Content
Raw Water

March 20, 2020

  • TPH- 322ppm
  • H2S- 317ppm
  • Iron- 8.01mg/l
  • ORP- -175mV
  • pH- 6.6
  • Turbidity- 1045ntu
  • Conductivity- 43.4mS

March 25, 2020

  • TPH- 712ppm
  • H2S- 249ppm
  • Iron- 0.74mg/l
  • ORP- -312mV
  • pH- 6.64
  • Turbidity- 175ntu
  • Conductivity- 46.7mS

High Oil Content
Discharge Water

March 20, 2020

  • TPH- 15ppm
  • H2S- 0.0ppm
  • Iron- 2.06mg/l
  • ORP- 316mV
  • pH- 6.5
  • Turbidity- 22.2ntu
  • Conductivity- 43.4mS

March 25, 2020

  • TPH- 4.07ppm
  • H2S- 0.0ppm
  • Iron- 0.53mg/l
  • ORP- 296mV
  • pH- 6.73
  • Turbidity- 14ntu
  • Conductivity- 45mS

High H2S Content

Raw Water
TPH- 683ppm
H2S- 291ppm
Iron- 3.55mg/l
ORP- -309mV
pH- 6.53
Turbidity- 210ntu
Conductivity- 47mS

Treated Water
TPH- 447ppm
H2S- 67ppm
Iron- 2.2mg/l
ORP- 356mV
pH- 6.42
Turbidity- 1136ntu
Conductivity- 48mS

Discharge Water
TPH- 0.87ppm
H2S- 0.0ppm
Iron- 0.37mg/l
ORP- 331mV
pH- 6.89
Turbidity- 3.72ntu
Conductivity- 48mS


IS SULFUR A PROBLEM?

While some believe colloidal sulfur is not a problem down-hole, we speculate that it can and will do damage to the formation. Below are pictures of instrumentation used in this trial BEFORE we removed the sulfur. You tell me if you think sulfur is a problem or not.

sulfur2.jpg


REMOVAL OF COLLOIDAL SULFURremoval.jpg

  • When hydrogen sulfide is oxidized into sulfur, the particles remain in a submicron state, making it difficult or impossible to remove them with standard filtration.
  • Big D has created a process to help break those colloids down, which allows us to remove over 70% (Wt% Sulfur 0.4630 to 0.1348) of the sulfur with a 20-micron filter and over 90% of the sulfur with a 10-micron filter (standard filtration).
  • Our flow through system allows 5,000 BPD to 100,000 BPD to be filtered safely, cost effectively,  and with a minimal footprint on your site.
  • Turnkey Frac Services
  • Turnkey Drill Site
  • Construction Company
  • Equipment Company
    • Pit Lining
    • Poly Pipe
    • Water Transfer
    • Water Treatment
      • Process Description
      • Custom Filters
      • Automation & Monitoring
    • Generators & Light Towers
    • Fencing - Temporary and Permanent
    • Water Wells
    • Automation
    • Drone Services
    • Trash Trailers
  • Turnkey Frac Services
  • Turnkey Drill Site
  • Construction Company
  • Equipment Company

© Copyright 2025 BigD Companies. All Rights Reserved. | Privacy Policy