BigD
  • Home
  • About
  • Safety
    • Safety Training
    • Credentials and Certifications
    • Job Safety Analysis
    • Safety Compliance Memberships
  • Services
    • Turnkey Frac Services
    • Turnkey Drill Site
    • Construction Company
      • Construction Overview
      • 3D GPS Precision
      • In-House Design
      • Drilling Locations, Pad Sites & Lease Roads
      • Frac Pit Construction
      • Tank Battery Facility Pads
      • Pit & Location Remediations
      • Environmental Cleanup
      • Deep Bury / Pit Closures
      • Drone Services
    • Equipment Company
      • Pit Lining
        • Liner Systems
        • Extrusion Welded Boots
        • Geotextile
        • Erosion Control
        • Liner Removal and Disposal
        • Load Lines
        • Aeration Systems
        • Bird Netting and Deterrent Systems
        • Floating Frac Pit Covers
      • Poly Pipe
        • Poly Pipe Rental & Sales
        • Load Lines
        • Custom Poly Pipe Fabrication
        • Pipeline Install and Trenching
        • Rig Move & Drill Site Installations
        • Poly Pipe Banding & Transportation
      • Water Transfer
        • Frac Site & Pit to Pit Services
        • Automated Blending Manifolds
        • Flowback Transfer Services
        • Lay Flat Hose
        • Diesel Transfer Pumps
      • Water Treatment
        • Process Description
        • Custom Filters
        • Automation & Monitoring
      • Generators & Light Towers
      • Fencing - Temporary and Permanent
      • Water Wells
        • Water Well Pump Rental & Sales
        • Submersible Pit Pumps
        • Electrical Centrifugal Booster Pumps
        • Diesel Transfer Pumps
      • Automation
        • SCADA
        • Camera Systems
        • Production Automation
        • Water Automation
        • Rentals
      • Drone Services
      • Trash Trailers
  • Gallery
  • Contact
  • Careers
  • News
  • Web Portal
  • Turnkey Frac Services
  • Turnkey Drill Site
  • Construction Company
    • Construction Overview
    • 3D GPS Precision
    • In-House Design
    • Drilling Locations, Pad Sites & Lease Roads
    • Frac Pit Construction
    • Tank Battery Facility Pads
    • Pit & Location Remediations
    • Environmental Cleanup
    • Deep Bury / Pit Closures
    • Drone Services
  • Equipment Company
    • Pit Lining
    • Poly Pipe
    • Water Transfer
    • Water Treatment
    • Generators & Light Towers
    • Fencing - Temporary and Permanent
    • Water Wells
    • Automation
    • Drone Services
    • Trash Trailers
  • slide
  • slide
  • slide
  • slide

Tank Battery Facility Pads

Big D builds caliche pads for tank battery and saltwater disposal facilities. Facilities are leveled and compacted for holding multiple tanks, with berms and polyethylene liners capable of meeting secondary containment needs. Many facilities may require a new lease road or entrance off state highways. Big D can build or re-surface existing roads and provide paved, Department of Transportation-certified entrances off state highways. If needed, these roads can include standard caliche entrances with cattle guards.

Although Big D Construction does not build the facility after the pad is complete, our other departments can provide the secondary containment, poly pipe coming to and from the facility, and long-term automation services.  Rental generators can also be provided to power the facility until pole power is installed.

  • Turnkey Frac Services
  • Turnkey Drill Site
  • Construction Company
    • Construction Overview
    • 3D GPS Precision
    • In-House Design
    • Drilling Locations, Pad Sites & Lease Roads
    • Frac Pit Construction
    • Tank Battery Facility Pads
    • Pit & Location Remediations
    • Environmental Cleanup
    • Deep Bury / Pit Closures
    • Drone Services
  • Equipment Company
  • Turnkey Frac Services
  • Turnkey Drill Site
  • Construction Company
  • Equipment Company

© Copyright 2023 BigD Companies. All Rights Reserved. | Privacy Policy